Plan the dust-producing work before the other trades arrive

Share Article

Christchurch construction site in black and white

Controlling a dusty task also means considering the people working beside it and those who arrive afterwards.

A concrete-cutting task can be treated as one subcontractor’s activity even when its effects reach the whole work area. Nearby trades may be fitting services, moving materials or preparing finished surfaces while the work is underway.

Planning the task in isolation misses that shared space. Before booking it, bring together the people who need to understand the exposure risks and the controls.

Start with the actual material and task

WorkSafe explains that respirable crystalline silica can be generated when materials such as concrete, brick and stone are disturbed, and that the particles may not be visible. The absence of an obvious cloud is therefore not a reliable sign that exposure is controlled.

Have competent people assess the task and specify appropriate controls. WorkSafe’s guidance supports eliminating or minimising exposure; a generic instruction to wear a mask is not a complete control plan. Where specialist assessment is needed, arrange it before the work starts.

The coordination discussion should cover the location, other workers, the proposed method, access and how the area will be managed. It should also establish who checks that the planned controls are in place and working.

Include cleanup and the next trade

Ask how residues, equipment and the work area will be managed after the task. Do not assume that another contractor’s arrival means the space is ready for unrestricted use. Agree what confirmation is required and who provides it.

If the method, material or conditions change, revisit the plan. A control arrangement prepared for one task should not be automatically carried over to a different one because the same subcontractor is doing it.

Keep the instructions specific enough for the people on site to use. “Dust controlled” does not explain the work boundary, the responsible person or what to do if the arrangements fail.

This is a coordination framework, not a technical dust-control specification. The method, equipment, respiratory protection and any monitoring need to suit the actual risk and relevant professional guidance.

Good programming cannot replace effective controls, but it can create the conditions for them to work. Giving a dusty task its own preparation and handover makes it less likely that another crew will discover the risk only after arriving in the middle of it.

Find What Matters to You

Construction

The latest on builds, materials, and methods shaping New Zealand's construction landscape.

Health & Safety

Keeping Kiwi workers safe on site: regulations, incidents, and best practice guidance.

Industry News

What's happening across New Zealand's building and trades sector, right now.

Regulations & Compliance

Building consents, code changes, and compliance updates you need to stay on the right side of.

Guides & Advice

Practical advice for builders, contractors, and tradies running a smarter business.

Costs & Pricing

Material costs, labour rates, and market trends affecting your bottom line.